Concrete
  • Print
  • Bookmark

Chronolia®

Chronolia® uses advanced technology for easier placement than conventional concrete, enabling improved turnaround time and productivity. 

Chronolia® concrete uses advanced technology for easier placement than with conventional concrete. Workability ranges from 90 to 120 minutes from batching with the benefit of high early strength, enabling improved turnaround time and productivity.

 

Responding to the needs of contractors and designers, Chronolia® offers a wide range of products that allow for stripping times as soon as 4 hours after batching with Chronolia® 4H. The Chronolia™ product ranges from 4H to 48H to save time and accelerate construction schedules.

 


Applications

 

  • The construction of walls, columns and beams
  • Flatwork applications where a fast-track construction process is required
  • Civil engineering projects where quick turnaround time is required

 

Advantages

 

Chronolia's rapid strength gain allows faster formwork removal for concretes at temperatures exceeding 10°C (50°F) and in ambient air temperatures as low as those experienced in extreme winter conditions. These characteristics give Chronolia several advantages over conventional concrete:

 

  • Chronolia is typically easier to place than conventional concrete.
  • Chronolia can double the number of daily rotations for walls, columns, slabs on grade and grade beams, allowing greater flexibility in construction schedules in relation to the rotation of formwork.
high early strength concrete, construction schedule, early
high early strength concrete, construction schedule, early

Faster concrete construction

high early strength concrete, construction schedule, early

A real boost for performance

Related Downloads

  • Print
  • Bookmark

Find A Lafarge Location Near You

Social media
LafargeHolcim. Cement, aggregates, Concrete.